Manufacturing Plant Building Addition

Hanwha Azdel commissioned Wiley|Wilson to provide design and construction-phase services to their manufacturing plant building addition to accommodate two new production lines and nine new loading docks.

The design included the following features:

  • Loading dock and building entrance
  • One-story insulated 87,000 SF pre-engineered metal building
  • Restrooms
  • Lab spaces
  • Office spaces
  • Exterior lighting
  • Entrance road realignment
  • Domestic water
  • Sanitary sewer
  • Storm sewer
  • Realignment of utilities impacted by proposed building footprint
  • Stormwater quality and quantity management features
  • Site development/survey
  • Fire protection
  • Plumbing design
  • HVAC design