Wastewater Pump Station - Henrico County, Virginia

Wiley|Wilson completed the Elko Wastewater Pump Station as a “fast track” project that was successfully completed to meet the scheduling needs of the White Oak semiconductor complex. Wiley|Wilson worked with Henrico County to construct the 13 MGD pump station which was designed to serve industrial, commercial and residential development in eastern Henrico County. The primary driver for the project was the White Oak semiconductor complex. The fast track design and construction efforts resulted in successful project completion by the time the complex was complete and ready to begin production.
  • Fast Track Permitting Allowed Construction to be Completed to Meet Industry Driven Schedule
  • Preliminary Engineering, Detailed Design, and Construction Administration
  • Full Integration Between Local PLC and County SCADA System
  • All Features are Designed to Expand from 13 MGD to 33 MGD with Additional Pump UnitsHydraulic Analysis of Pumping Options and Header Arrangements to Maximize Pump Efficiency
  • Water Hammer and Surge Protection based on Hydraulic Analysis of the Pump Station Force Main
  • Odor Control Facilities to Minimize Impact on Residential Developments