Wiley|Wilson recently completed a plant capacity expansion and nutrient removal upgrade project to increase capacity for Dale Service Corporation’s Section 1 and Section 8 WWTPs. Each facility was expanded from 4.0 MGD per plant to 4.6 MGD per plant. Wiley|Wilson worked with the Owner and Virginia DEQ to re-rate both wastewater treatment plants from 4.0 to 4.6 MGD while minimizing required new unit processes. In addition to the capacity increase, the project included nutrient removal treatment upgrades to enable each WWTP to meet an assigned wasteload allocation corresponding to 3 mg/l total nitrogen concentration.
  • Preliminary Engineering, Detailed Design, and Construction Administration
  • Grant and Loan Support, Permitting, and Compliance Services
  • 3D Modeling to Assist in Client Visualization and Design Review
  • Limit of Technology Nutrient Treatment
  • Tertiary Chemical Clarifiers and Cloth-Disc Filters
  • Upgrades to Aluminum Salt Chemical Storage and Feed Systems
  • Methanol (Supplemental Carbon) Storage and Feed Facility
  • Sodium Hypochlorite (Foam Control) Storage and Feed Facility
  • Digester Thickening (Gravity Belt Thickener) and Recirculation Facility