Membrane Bio-Reactor Advanced Nutrient Removal Treatment Facility - Culpeper, Virginia




3D CAD Design Minimized the
Footprint and Contractor Error for
a Complex Yard Piping
Arrangement 
3D Rendering of
CAD Model Used to Design
Membrane Bio-Reactor WWTP
Completed
Membrane Bio-Reactor
WWTP

Wiley|Wilson was the design engineer for the Culpeper County Green’s Corner WWTP. The facility is a green-field 0.1 MGD membrane bio-reactor advanced wastewater treatment plant that was commissioned August 2008. The project was completed on a fast-track basis so that the facility was in operation to provide service for the opening of the New Culpeper County High School. To meet the schedule, Wiley|Wilson worked with the Owner and Virginia DEQ to expedite permitting and to procure a fully factory-tested and functional package membrane bioreactor system as owner furnished equipment using a request for proposal process. The treatment system met all permit requirements and achieved total nitrogen < 3.5 mg/l and TP < 0.3 mg/l within the first month of operation.
  • Fast Track Equipment Procurement via Request for Proposal and “Final Engineering Report” Permitting Process
  • Preliminary Engineering, Detailed Design, and Construction Administration
  • 3D Modeling to Assist in Client Visualization and Design Review
  • Membrane Bio-Reactor Technology to Minimize Footprint and Allow for Future Beneficial Re-use
  • Limit of Technology Nutrient Treatment to Meet Stringent Limits: TN < 4 mg/l; TP < 0.3 mg/l; BOD < 10 mg/l; TSS < 10 mg/l; and Fecal Coliform < 23 col/100 mil
  • 4-Stage Bardenpho Activated Sludge Process in Total Enclosed Basins
  • Chemical Feed and Storage Facilities
  • Re-Aeration and Enclosed UV Disinfection